During the panel “CCSA Country Spotlight Series Live: Eastern Europe”, held as part of the CCSA EU Conference 2026 in Brussels, representatives of Poland, Romania and Bulgaria discussed the current state of CCUS development in their countries and the challenges that continue to slow down project delivery.
The discussion brought together Ionuț-Sorin Banciu, Vice-President of Romania’s National Regulatory Authority for Mining, Petroleum and Geological Storage of CO₂, Konstantin Bojnov, Head of the ANRAV CCUS Project at Heidelberg Materials Bulgaria, and Paweł Gładysz, President of the Board of CCUS Poland.
Although the situation differs from country to country, the panel repeatedly returned to the same key issues: project financing, infrastructure development, streamlined administrative procedures and stronger government involvement in building the CCUS market.
Poland: projects are ready, but regulation is still lagging behind
Paweł Gładysz pointed out that, over the coming decades, Poland will still emit around 25 million tonnes of CO₂ annually from hard-to-abate sectors. This means that CCS and CDR technologies will be an essential part of the country’s industrial transformation.
According to the President of CCUS Poland, the main problem today is not a lack of projects or insufficient interest from industry. The real barrier is the pace of regulatory change and the absence of a systemic support framework for investment.
As an example, he referred to the regulation published on 12 June 2026, which identified 18 locations for the exploration of potential underground CO₂ storage sites. However, 32 months passed between the legislative change enabling the development of commercial CCS projects and the adoption of this regulation.
Paweł Gładysz also discussed ongoing work on regulations for CO₂ transport and on Poland’s national CCUS strategy. He noted that, despite limited public support, further projects related to CO₂ storage and transport are already being developed.

Romania: geological potential and first projects, but still no strategy
Ionuț-Sorin Banciu emphasised that Romania has significant CO₂ storage potential and many years of experience in the oil and gas sector. Despite this, the country has not yet developed a comprehensive CCUS strategy, although the basic regulatory framework needed to enable project development is already in place.
Banciu also noted that more than 150 years of oil and gas production means that tens of thousands of historic wells need to be assessed before CO₂ storage projects can move forward.
Despite these challenges, the first investments supported by EU funding are now emerging in Romania. In Banciu’s view, these projects could play an important role in building confidence in CCS technology and encouraging more actors to become involved in the market.
Bulgaria: investors are waiting for stable conditions
Konstantin Bojnov stressed that one of the key challenges remains political instability. In recent years, Bulgaria has been governed by a series of interim governments, which has made it difficult to pursue a consistent industrial policy and take long-term decisions on the development of new technologies.
Preparations for CCS projects have been underway for several years, but investors are still waiting for administrative decisions that would allow them to move to the next stages of project development.
According to Bojnov, without instruments that reduce investment risk, it will be difficult to attract the capital needed to deliver large-scale CCS projects.
Common challenges across the region
he panel participants pointed to the same set of challenges: lack of financing, lengthy administrative procedures and insufficient capacity within public administration.
The discussion also highlighted the role of EU funding and the need for stronger regional cooperation, both in the development of transport infrastructure and in the implementation of cross-border projects.

Central and Eastern Europe wants to be part of the European CCUS market
Poland, Romania and Bulgaria all have geological potential, are developing their first projects and are building the expertise needed to deploy CCS technologies. At the same time, representatives of the region expect stronger support from national governments and EU institutions to accelerate investment.
The debate was no longer about whether CCUS will be needed. It was about how to create the conditions for the first large-scale projects to be delivered. That appears to be the key challenge for Central and Eastern Europe today.
